SARS 2026/2027LIVERepo Rate7.00%+0,25% since 28 May 2026Prime Rate10.50%+0,25% since 28 May 2026VAT Rate15%UIF CeilingR17,712Tax ThresholdR99,000USD/ZAR16.41Exchange rate updated 29 Sept 2026Municipal audits5 of 26clean · tracked hereLatest case27 Jul 2026GautengWater systems2824 cited-period concernsSARS 2026/2027LIVERepo Rate7.00%+0,25% since 28 May 2026Prime Rate10.50%+0,25% since 28 May 2026VAT Rate15%UIF CeilingR17,712Tax ThresholdR99,000USD/ZAR16.41Exchange rate updated 29 Sept 2026Municipal audits5 of 26clean · tracked hereLatest case27 Jul 2026GautengWater systems2824 cited-period concerns
OOdyssey Tools
EvidenceReview incomplete · Documented building casesFamily-level scope · details ↓

Evidence status is dataset-family level. Row-level and field-level source labels still control where they are more specific.

Home›Buildings Tracker›Wimbledon Building
Johannesburg · Gauteng · Source snapshot 7 April 2025

Wimbledon Building

Johannesburg Inner City

High RiskRelocation / eviction recordedHijacked Building

Wimbledon Building, at Johannesburg Inner City in Johannesburg, appears in Odyssey's curated tracker as a hijacked building based on the cited record. The tracker records the source-dated status as relocation / eviction recorded, using a source snapshot dated 7 April 2025; this is not presented as a live current legal or occupancy status. Odyssey classifies the row as high risk for tracker navigation; that label is not a structural or fire-safety assessment.

Documented details

Source-dated statusRelocation / eviction recorded
Building typeHijacked Building
Odyssey tracker risk classificationHigh Risk
AddressJohannesburg Inner City, Johannesburg, Gauteng
Source-reported occupantsNot available
Legal ownerNot available
Known syndicateNot available
Court order dateNot available
Documented fire incidentsNot available
Source snapshot date7 April 2025

The City of Johannesburg recorded Wimbledon Building on Wolmarans Street as declared unsafe, with relocation underway. Odyssey preserves the 7 April 2025 source snapshot and does not present it as a live status.

Status citation — City of Johannesburg — Inner-City Revitalisation Plan, 7 April 2025

Source snapshot 7 April 2025

View cited status source →

Citation class: direct official link

📱 Share this record

Other documented buildings in Johannesburg

Remington CourtRedevelopment recordedM.O.T.H BuildingCourt order recordedVannin CourtRelocation / eviction recorded
View the full Buildings Tracker →

Data integrity and legal notice

Status labels describe what the linked record reported at its source snapshot date. They are not presented as live legal, occupancy, ownership or enforcement status unless a row is explicitly re-verified. Risk levels are Odyssey tracker classifications based on cited historical or source-dated records. They are not structural-engineering, fire-safety, emergency-response or legal determinations, and should not be used to decide whether a building or area is currently safe.

This is a curated tracker, not an exhaustive citywide building register. No nearby tracked row means only that Odyssey has no record from this sample within the search radius; it is not a safety clearance or proof that no problem building exists nearby. The linked citation may be a direct official source or documented secondary reporting; that provenance is shown on this page and does not convert a source-dated row into live current status.