SARS 2026/2027LIVERepo Rate7.00%+0,25% since 28 May 2026Prime Rate10.50%+0,25% since 28 May 2026VAT Rate15%UIF CeilingR17,712Tax ThresholdR99,000USD/ZAR16.41Exchange rate updated 29 Sept 2026Municipal audits5 of 26clean · tracked hereLatest case27 Jul 2026GautengWater systems2824 cited-period concernsSARS 2026/2027LIVERepo Rate7.00%+0,25% since 28 May 2026Prime Rate10.50%+0,25% since 28 May 2026VAT Rate15%UIF CeilingR17,712Tax ThresholdR99,000USD/ZAR16.41Exchange rate updated 29 Sept 2026Municipal audits5 of 26clean · tracked hereLatest case27 Jul 2026GautengWater systems2824 cited-period concerns
OOdyssey Tools
EvidenceReview incomplete · Documented building casesFamily-level scope · details ↓

Evidence status is dataset-family level. Row-level and field-level source labels still control where they are more specific.

Home›Buildings Tracker›Florence Nightingale Building
Johannesburg · Gauteng · Source snapshot 20 January 2026

Florence Nightingale Building

Johannesburg Inner City

High RiskCourt order recordedHijacked Building

Florence Nightingale Building, at Johannesburg Inner City in Johannesburg, appears in Odyssey's curated tracker as a hijacked building based on the cited record. The tracker records the source-dated status as court order recorded, using a source snapshot dated 20 January 2026; this is not presented as a live current legal or occupancy status. Odyssey classifies the row as high risk for tracker navigation; that label is not a structural or fire-safety assessment. The row records 1 documented fire incident.

Documented details

Source-dated statusCourt order recorded
Building typeHijacked Building
Odyssey tracker risk classificationHigh Risk
AddressJohannesburg Inner City, Johannesburg, Gauteng
Source-reported occupantsNot available
Legal ownerNot available
Known syndicateNot available
Court order dateNot available
Documented fire incidents1
Source snapshot date20 January 2026

Daily Maverick's 20 January 2026 reporting on court papers described a court order and severe deterioration. A separate City of Johannesburg record from 22 June 2023 confirms a fatal fire, that the building had previously been declared unfit for habitation, and that the City was pursuing reclamation. B2 keeps the later court-status citation secondary and does not infer a current occupation or implementation stage.

Status citation — Daily Maverick court papers

Source snapshot 20 January 2026

View cited status source →

Citation class: documented secondary link

Additional evidence anchors

City of Johannesburg — Florence Nightingale fire response →

Direct City evidence for the fire, prior unfit-for-habitation declaration and reclamation effort; it does not prove the later court-order implementation status.

2023-06-22 · direct official link · incident and city context

📱 Share this record

Other documented buildings in Johannesburg

Remington CourtRedevelopment recordedM.O.T.H BuildingCourt order recordedVannin CourtRelocation / eviction recorded
View the full Buildings Tracker →

Data integrity and legal notice

Status labels describe what the linked record reported at its source snapshot date. They are not presented as live legal, occupancy, ownership or enforcement status unless a row is explicitly re-verified. Risk levels are Odyssey tracker classifications based on cited historical or source-dated records. They are not structural-engineering, fire-safety, emergency-response or legal determinations, and should not be used to decide whether a building or area is currently safe.

This is a curated tracker, not an exhaustive citywide building register. No nearby tracked row means only that Odyssey has no record from this sample within the search radius; it is not a safety clearance or proof that no problem building exists nearby. The linked citation may be a direct official source or documented secondary reporting; that provenance is shown on this page and does not convert a source-dated row into live current status.